Last Truss Is UP!

FIELD REPORTS /

January 28, 2025

Follow our SHS students working             with local  trades to build their                        first ADU!

Weekly field report • Rick Fout

Exterior trim and siding go on while students learn rough plumbing alongside local tradespeople.

SUMMIT HIGH SCHOOL • HANDS-ON LEARNING

Rick's Field Report 01/28/25

From Taylor the Energy rater, to Phil the Insulator, to Justin the Carpenter, to Heath the Framer, to Silos the ex-student turned Carpenter, to Paul and his Wife!


They were all out here enjoying the sunshine and supporting the High Schoolers, Everyday Hero’s in my book!!


Life’s better with them in it, especially for these kids getting these rich experiences in construction!!!


Check out the TH1 Feature in Breckenridge Magazine

Double Diamond_171 Lake Edge_edited.jpg

CURRENT BUILD

Summit High School ADU

2026-2027 school year

This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.

The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.

874 SQ. FT.

Total living space

2 BEDROOMS

Plus 1 Bathroom

SPRING 2027

Target Completion

This week in photos
 

A closer look at the project.

Click a photo to enlarge

Your support helps us continue to give Summit County's kids

real world, hands-on experience and exploration into skilled trades pathways.

Help build us build cool stuff.