top of page
HalftoneWood01-byGhostlyPixels.png

Let's Rock - DRYWALL!

FIELD REPORTS /

February 4, 2024

Follow our SHS students working             with local  trades to build their                        first ADU!

Weekly field report • Rick Fout

Students and volunteers tackle theater stairs, landings, and walls—and work together to reposition the set.

SUMMIT HIGH SCHOOL • HANDS-ON LEARNING

Rick's Field Report 02/04/24

Working On The SHS’s Tiny Home 1-26-24


The last of the Tyvek house wrap goin on (pretty like a present)!


All the windows in place (so the plumber and his students can stay warm inside)!!


The cool black edge metal finished on top, up at the cool black fascia (so the roofing can start to go on tomorrow)!!!


(plenty of action photo’s below, see new 3d perspectives Way down below too please, thanks to expert insulator Tom Miner for stopping by)


Some tweaks (Rick’s suggested food for thought) to the original concept perspectives by our hot shot archi friend Tim Sabo! More metal, less wood = lighter?

Double Diamond_171 Lake Edge_edited.jpg

CURRENT BUILD

Summit High School ADU

2026-2027 school year

This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.

The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.

874 SQ. FT.

Total living space

2 BEDROOMS

Plus 1 Bathroom

SPRING 2027

Target Completion

This week in photos
 

A closer look at the project.

Click a photo to enlarge

Your support helps us continue to give Summit County's kids

real world, hands-on experience and exploration into skilled trades pathways.

Help build us build cool stuff.

© 2023 Summit County Builder's Association

​

699 Summit Blvd, Unit H/PO Box 2245, Frisco, CO 80443

bottom of page