Workin On SHS’s Tiny Home Project Fri-2-9-24
Almost done with the roofing!
Almost done with the interior framing!!
Almost done with the interior loft area as well!!!
(final final on the exterior look attached here too folks, thanks Tim)

CURRENT BUILD
Summit High School ADU
2026-2027 school year
This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.
The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.
874 SQ. FT.
Total living space
2 BEDROOMS
Plus 1 Bathroom
SPRING 2027
Target Completion