SUMMIT HIGH SCHOOL • HANDS-ON LEARNING
Rick's Field Report 04/03/25
Last spot of siding on the back side going down! (I feel like I’ve typed that before, huh)
Weatherizing around wheel wells going on!!
Painter spraying walls/clg inside check!!!
Yep, Rick knows how to use a skill saw (last couple pics), not just an architectural scale and a red pen. Ha

CURRENT BUILD
Summit High School ADU
2026-2027 school year
This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.
The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.
874 SQ. FT.
Total living space
2 BEDROOMS
Plus 1 Bathroom
SPRING 2027
Target Completion