Rick's Field Report 05/05/24
Gettin It Done
Drywall is hung (thanks Juan)!
Drywall tape and mud is being applied (thanks Juan)!!
Feels good to write this… Paint and Cabinets are Next (thanks David)!!!
(oh and in the shop, the cool ladder to the sleeping loft is being built, thanks Heath!)

CURRENT BUILD
Summit High School ADU
2026-2027 school year
This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.
The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.
874 SQ. FT.
Total living space
2 BEDROOMS
Plus 1 Bathroom
SPRING 2027
Target Completion