Rick's Field Report 09/10/25
We had some weather roll in, no biggie all good, we carried on cuz ya gotta work in some weather in the Trades!
We were leveling up the deck/trailer when it hit (“Level On The Level” to quote John Prine from Grampa Was A Carpenter)!!
We kept working, nailing double Cripples to King Studs (don’t worry if you don’t know what those are, all these kids now do, ha)!!!

CURRENT BUILD
Summit High School ADU
2026-2027 school year
This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.
The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.
874 SQ. FT.
Total living space
2 BEDROOMS
Plus 1 Bathroom
SPRING 2027
Target Completion