Weekly field report • Rick Fout

Floor joists are finished, floor sheathing is underway, and a state inspection is coming next.

SUMMIT HIGH SCHOOL • HANDS-ON LEARNING

Rick's Field Report 09/14/26

Floor joists finished! Floor sheathing coming along!! During weeks two and three of the modular ADU build, students completed the floor joists and moved on to finishing the floor sheathing. Rick reported that a state inspection was scheduled for Wednesday—the next step as the project moves ahead.

Double Diamond_171 Lake Edge_edited.jpg

CURRENT BUILD

Summit High School ADU

2026-2027 school year

This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.

The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.

874 SQ. FT.

Total living space

2 BEDROOMS

Plus 1 Bathroom

SPRING 2027

Target Completion

This week in photos
 

A closer look at the project.

Click a photo to enlarge

Your support helps us continue to give Summit County's kids

real world, hands-on experience and exploration into skilled trades pathways.