Rick's Field Report 09/14/26
Floor joists finished! Floor sheathing coming along!! During weeks two and three of the modular ADU build, students completed the floor joists and moved on to finishing the floor sheathing. Rick reported that a state inspection was scheduled for Wednesday—the next step as the project moves ahead.

CURRENT BUILD
Summit High School ADU
2026-2027 school year
This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.
The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.