SUMMIT HIGH SCHOOL • HANDS-ON LEARNING
Rick's Field Report 09/18/26
All thumbs up at the modular ADU project! Oakley and the students finished the decks, and Rick reported a thumbs-up from the state inspector. Doug also toured the construction with an associate on Friday. Next up: walls—and the team has already started. Bam!

CURRENT BUILD
Summit High School ADU
2026-2027 school year
This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.
The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.
874 SQ. FT.
Total living space
2 BEDROOMS
Plus 1 Bathroom
SPRING 2027
Target Completion