SUMMIT HIGH SCHOOL • HANDS-ON LEARNING
Rick's Field Report 10/08/25
Sunny Skies prevailed!
And so did these volunteer tradespeople and these high school students they are teaching!!
Both groups are led by Oakley (the only actual teacher, ha) and form a mighty construction army on the attack!!!
And it really shows, heck the last roof truss went up this day.

CURRENT BUILD
Summit High School ADU
2026-2027 school year
This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.
The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.
874 SQ. FT.
Total living space
2 BEDROOMS
Plus 1 Bathroom
SPRING 2027
Target Completion