
CIC SUMMIT
CAREERS IN CONSTRUCTION
SUMMIT HIGH SCHOOL • HANDS-ON LEARNING
Rick's full report
Last week Paul and I got all three rough inspections (plumbing, electrical & framing so we could proceed) passed with our “FaceTimed” in tiny home inspector out of Florida for our certification at the end.
Students and volunteers smeared “pookie” in all the seams, cracks, and holes of the shell with direction from Division 7 Insulation Contractors, the very best in the area!
The cavity below the living room was opened up vacuumed out and the tube was run in there to fill it with blown-in insulation particles (foam for walls and ceilings next)!!
The siding continued outside on the back of the building, the one spot that is not quite fully sided and trimmed!!!
CURRENT BUILD
Summit High School ADU
2026-2027 school year
This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.
The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.
874 SQ. FT.
Total living space
2 BEDROOMS
Plus 1 Bathroom
SPRING 2027
Target Completion
This week in photos
A closer look at the project.

Click a photo to enlarge
Your support helps us continue to give Summit County's kids
real world, hands-on experience and exploration into skilled trades pathways.





















