Rick's Field Report 02/05/26
Waiting on drywall delivery. Continued siding outside and pocket door hardware inside.

CURRENT BUILD
Summit High School ADU
2026-2027 school year
This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.
The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.
874 SQ. FT.
Total living space
2 BEDROOMS
Plus 1 Bathroom
SPRING 2027
Target Completion