Concrete Day At Da Build!

Follow our SHS students working             with local  trades to build their                        first ADU!

Orr Concrete leads hands-on forming and pouring lessons while the tiny home's framed walls are standing.

Weekly field report • Rick Fout

SUMMIT HIGH SCHOOL • HANDS-ON LEARNING

Rick's full report

Great progress was made on the exterior finishes this week, thanks to cooperative weather and the students' hard work. We came close to completing the exterior finishes and hope to wrap them up next week. Despite raw, cold, and windy weather on Friday, the students remained undeterred, learning how to install shiplap and metal siding. They worked so efficiently that the guys couldn't keep up with them, and Heath has them hustling.


Plumber Dominick made significant strides, starting to lay out and drill waste pipes in the floor. He also showed the students how to space a kitchen layout and installed the shower valve, in addition to laying out bathroom fixtures, getting ready to start running water lines next week. Electrician Joe is on-site, working on an electrical layout and hoping to start this week.


Classes will be held this week on Monday and Wednesday at 11:40 am, as schools will be out on Friday and the following Monday. Please note that Val has set up the SCBA Website with the CIC program and the weekly status, with pictures. Special thanks to Elizabeth McBurney and Val for making that happen. If you want to update someone on the program's progress, refer them to summitcountybuilders.org, click on events and programs, then CIC.


If you have some time, please stop by the school and check out the progress. ~ Paul

Double Diamond_171 Lake Edge_edited.jpg

CURRENT BUILD

Summit High School ADU

2026-2027 school year

This year's Careers in Construction project is a two-bedroom, one-bath modular ADU being constructed by Summit High School students alongside local trades professionals.

The two modular sections are being built at the high school and will be transported to Summit Cove, where they'll become part of a permanent residence for a local homeowner.

874 SQ. FT.

Total living space

2 BEDROOMS

Plus 1 Bathroom

SPRING 2027

Target Completion

This week in photos
 

A closer look at the project.

Click a photo to enlarge

Your support helps us continue to give Summit County's kids

real world, hands-on experience and exploration into skilled trades pathways.

Help build their next chapter.

© 2023 Summit County Builder's Association

​

699 Summit Blvd, Unit H/PO Box 2245, Frisco, CO 80443

bottom of page